<?xml version='1.0' encoding='utf-8'?>
<rss version="2.0"><channel><title>Majestic Shenzhen - EN</title><link>https://www.majestic-shenzhen.com/en/blog/</link><description>Supplier sourcing and quality control in China</description><language>en</language><item><title>Golden samples in China sourcing: connecting sample approval, production and inspection</title><link>https://www.majestic-shenzhen.com/en/blog/golden-sample-china-production-inspection/</link><guid>https://www.majestic-shenzhen.com/en/blog/golden-sample-china-production-inspection/</guid><description>The sample looks right, the price is agreed and the order is ready to move forward. It may seem that buyer and supplier now share the same understanding of the expected result. Yet the instruction “make it like the sample” is not enough on its own. Weeks later, the supplier may be working from another revision, a material may have changed, or a feature the buyer considered essential may have been treated as optional.

A golden sample is an agreed reference that connects negotiation, production and quality control. It turns a subjective approval into something that can support an inspection. It works, however, only when it is linked to a current specification, a clearly identified revision and a practical change-control process.</description><pubDate>Mon, 16 Nov 2026 00:00:00 +0000</pubDate></item><item><title>Factory acceptance testing in China: how to approve made-to-order equipment before final payment</title><link>https://www.majestic-shenzhen.com/en/blog/factory-acceptance-test-before-final-payment-china/</link><guid>https://www.majestic-shenzhen.com/en/blog/factory-acceptance-test-before-final-payment-china/</guid><description>When equipment is manufactured or configured for a specific order, a standard visual check before shipment may not be enough. The buyer needs evidence that the finished system matches the agreed configuration, performs the required functions and can move to packing without unresolved critical issues.

This is the purpose of a factory acceptance test, or FAT, at the supplier’s site. A useful FAT is not simply a demonstration that “the machine works.” It is a structured check against agreed acceptance criteria before final payment and shipment from China.</description><pubDate>Mon, 02 Nov 2026 00:00:00 +0000</pubDate></item><item><title>How to plan a large-batch inspection: what to check in full and what to sample</title><link>https://www.majestic-shenzhen.com/en/blog/large-batch-inspection-scope/</link><guid>https://www.majestic-shenzhen.com/en/blog/large-batch-inspection-scope/</guid><description>The instruction “check 100% of the batch” sounds precise, but in practice it can describe very different tasks. An inspector may reconcile every shipping package, count every unit, check every label, visually examine each item or run a complete functional test. Each level of control requires different time, equipment and cost.</description><pubDate>Mon, 19 Oct 2026 00:00:00 +0000</pubDate></item><item><title>How to prepare a China supplier sourcing brief that produces comparable quotes</title><link>https://www.majestic-shenzhen.com/en/blog/china-supplier-sourcing-brief/</link><guid>https://www.majestic-shenzhen.com/en/blog/china-supplier-sourcing-brief/</guid><description>A request such as “find several suppliers and compare prices” sounds clear. In practice, without one common brief, companies often quote different configurations, volumes and conditions, making a fair comparison impossible.</description><pubDate>Mon, 05 Oct 2026 00:00:00 +0000</pubDate></item><item><title>Why test a device in China before placing an order</title><link>https://www.majestic-shenzhen.com/en/blog/functional-test-before-order-china/</link><guid>https://www.majestic-shenzhen.com/en/blog/functional-test-before-order-china/</guid><description>Specifications, presentations and supplier videos are not always enough. Before placing an order, a buyer may need to see how the specific device performs in an agreed scenario and receive independent evidence for a commercial decision.</description><pubDate>Mon, 21 Sep 2026 00:00:00 +0000</pubDate></item><item><title>China+1 does not remove China supplier verification risk</title><link>https://www.majestic-shenzhen.com/en/blog/2026-07-06-china-plus-one-supplier-verification/</link><guid>https://www.majestic-shenzhen.com/en/blog/2026-07-06-china-plus-one-supplier-verification/</guid><description>China+1 can reduce dependency on one sourcing country, but it does not remove operational risk inside China. If a Chinese supplier remains part of the chain, it still needs to be verified before money moves.</description><pubDate>Mon, 06 Jul 2026 00:00:00 +0000</pubDate></item><item><title>What can go wrong between QC and container loading</title><link>https://www.majestic-shenzhen.com/en/blog/2026-06-29-container-loading-control-risk/</link><guid>https://www.majestic-shenzhen.com/en/blog/2026-06-29-container-loading-control-risk/</guid><description>A practical guide for reducing China sourcing risk before payment.</description><pubDate>Mon, 29 Jun 2026 00:00:00 +0000</pubDate></item><item><title>Why inspect goods before the balance payment</title><link>https://www.majestic-shenzhen.com/en/blog/2026-06-22-pre-shipment-before-balance-payment/</link><guid>https://www.majestic-shenzhen.com/en/blog/2026-06-22-pre-shipment-before-balance-payment/</guid><description>A practical guide for reducing China sourcing risk before payment.</description><pubDate>Mon, 22 Jun 2026 00:00:00 +0000</pubDate></item><item><title>What a China factory inspection report should include</title><link>https://www.majestic-shenzhen.com/en/blog/2026-06-15-factory-visit-report/</link><guid>https://www.majestic-shenzhen.com/en/blog/2026-06-15-factory-visit-report/</guid><description>A factory inspection report should not be a photo album. It should help a buyer make a business decision: whether the supplier is suitable, what conditions must be fixed before payment, and which risks need follow-up control before production or shipment.</description><pubDate>Mon, 15 Jun 2026 00:00:00 +0000</pubDate></item><item><title>What to verify before paying a Chinese supplier deposit</title><link>https://www.majestic-shenzhen.com/en/blog/2026-06-09-supplier-check-before-deposit/</link><guid>https://www.majestic-shenzhen.com/en/blog/2026-06-09-supplier-check-before-deposit/</guid><description>A practical guide for reducing China sourcing risk before payment.</description><pubDate>Tue, 09 Jun 2026 00:00:00 +0000</pubDate></item><item><title>How to verify a Chinese supplier before payment</title><link>https://www.majestic-shenzhen.com/en/blog/supplier-checklist/</link><guid>https://www.majestic-shenzhen.com/en/blog/supplier-checklist/</guid><description>A practical verification flow for importers before sending a deposit to a new supplier in China.</description></item><item><title>Export documents to check before shipment from China</title><link>https://www.majestic-shenzhen.com/en/blog/shipping-docs/</link><guid>https://www.majestic-shenzhen.com/en/blog/shipping-docs/</guid><description>Document errors can delay customs even when the goods themselves are correct.</description></item><item><title>Logistics from Shenzhen to Russia and Europe in 2026</title><link>https://www.majestic-shenzhen.com/en/blog/shenzhen-logistics-2026/</link><guid>https://www.majestic-shenzhen.com/en/blog/shenzhen-logistics-2026/</guid><description>Shenzhen is strong for electronics and mixed cargo, but route choice depends on urgency, value and documentation.</description></item><item><title>What pre-shipment inspection is and when you need it</title><link>https://www.majestic-shenzhen.com/en/blog/pre-shipment/</link><guid>https://www.majestic-shenzhen.com/en/blog/pre-shipment/</guid><description>Pre-shipment inspection checks a finished or nearly finished batch before it leaves the factory.</description></item><item><title>FOB, EXW, CIF, DDP: which terms should importers choose</title><link>https://www.majestic-shenzhen.com/en/blog/incoterms-importer/</link><guid>https://www.majestic-shenzhen.com/en/blog/incoterms-importer/</guid><description>Incoterms define responsibility, cost and risk transfer. The cheapest quote is not always the safest option.</description></item><item><title>Factory or trading company: signs and checks</title><link>https://www.majestic-shenzhen.com/en/blog/factory-or-trader/</link><guid>https://www.majestic-shenzhen.com/en/blog/factory-or-trader/</guid><description>A trading company is not always bad, but you should know who controls production before you pay.</description></item><item><title>AQL in simple terms: how batches are accepted by quality</title><link>https://www.majestic-shenzhen.com/en/blog/aql-simple/</link><guid>https://www.majestic-shenzhen.com/en/blog/aql-simple/</guid><description>AQL is a sampling method that helps decide whether a batch is acceptable without checking every unit.</description></item></channel></rss>